title: How UG Mine Turned Around a $1.7 Million Loss by Analyzing the Data
description: "CASESTUDY: Analysis of the data coming off an Epiroc ST14 Scooptram indicated that the least efficient Scooptram Operator was consistently taking 3 times longer to fill the bucket than his counterparts. Prior to this analysis, the Operator had been sent for 1 week re-training on three separate occasions. His results from the re-training had been only a slight improvement in the overall load, haul and dump cycle."
image: https://epiroc.blog/hubfs/1-1.png
---

## [Epiroc Canada](https://www.miningandconstructionusa.com/canada?hsLang=en)

## [Content Zone](https://epiroc.blog/canada)

Find us here

[Epiroc Canada Website](https://www.epiroc.com/en-ca?hsLang=en)

[Contact Us](mailto:support.canada@epiroc.com)

![](https://epiroc.blog/hubfs/1-1.png)

# How UG Mine Turned Around a $1.7 Million Loss by Analyzing the Data

 Digitalization, Digital Solutions, Case Study 

 August 14, 2023

 By [Dawn Larsen](https://epiroc.blog/canada/author/dawn-larsen)

[![Share on facebook](https://f.hubspotusercontent00.net/hub/7528304/hubfs/raw_assets/public/mV0_hubspot/img/facebook-color.png?width=24&name=facebook-color.png)](http://www.facebook.com/share.php?u=https://epiroc.blog/canada/how-ug-mine-turned-around-a-1.7-million-loss-by-analyzing-the-data&utm_medium=social&utm_source=facebook) [![Share on linkedin](https://f.hubspotusercontent00.net/hub/7528304/hubfs/raw_assets/public/mV0_hubspot/img/linkedin-color.png?width=24&name=linkedin-color.png)](https://www.linkedin.com/shareArticle?mini=true&url=https%3A%2F%2Fepiroc.blog%2Fcanada%2Fhow-ug-mine-turned-around-a-1.7-million-loss-by-analyzing-the-data&title=How+UG+Mine+Turned+Around+a+%241.7+Million+Loss+by+Analyzing+the+Data&summary=CASESTUDY%3A+Analysis+of+the+data+coming+off+an+Epiroc+ST14+Scooptram+indicated+that+the+least+efficient+Scooptram+Operator+was+consistently+taking+3+times+longer+to+fill+the+bucket+than+his+counterparts.+Prior+to+this+analysis%2C+the+Operator+had+been+sent+for+1+week+re-training+on+three+separate+occasions.+His+results+from+the+re-training+had+been+only+a+slight+improvement+in+the+overall+load%2C+haul+and+dump+cycle.) [![Share on twitter](https://f.hubspotusercontent00.net/hub/7528302/hubfs/raw_assets/public/mV0_hubspot/img/twitter-color.png?width=24&name=twitter-color.png)](https://twitter.com/share?url=https://epiroc.blog/canada/how-ug-mine-turned-around-a-1.7-million-loss-by-analyzing-the-data&text=How%20UG%20Mine%20Turned%20Around%20a%20$1.7%20Million%20Loss%20by%20Analyzing%20the%20Data) [![Share on email](https://f.hubspotusercontent10.net/hub/7528315/hubfs/raw_assets/public/mV0_hubspot/img/email-color.png?width=24&name=email-color.png)](mailto:?subject=Check%20out%20https://epiroc.blog/canada/how-ug-mine-turned-around-a-1.7-million-loss-by-analyzing-the-data&utm_medium=social&utm_source=email%20&body=Check%20out%20https://epiroc.blog/canada/how-ug-mine-turned-around-a-1.7-million-loss-by-analyzing-the-data&utm_medium=social&utm_source=email)

**MINE GENERATES + 84 TONNES/SHIFT BY ANALYZING THE DATA**

CASESTUDY: Analysis of the data coming off an Epiroc ST14 Scooptram indicated that the least efficient Scooptram Operator was consistently taking 3 times longer to fill the bucket than his counterparts. Prior to this analysis, the Operator had been sent for 1 week re-training on three separate occasions. His results from the re-training had been only a slight improvement in the overall load, haul and dump cycle.

[Listen to the Interview with Gary Ralph, Senior Mining Advisor, Epiroc Canada](https://vimeo.com/827727382)

[![1-1](https://epiroc.blog/hs-fs/hubfs/1-1.png?width=699&height=694&name=1-1.png)](https://vimeo.com/827727382)

 

Cycle time was 7 minutes (shift colleagues was 6 minutes)

14 ton/bucket x 90% fill factor = 12.66t per load

**In an effective (6-hour shift x at 80% utilization) of available time the-**

Regular STO = 4.8 hours / 6 min = 48 cycles per shift

Slower STO = 4.8 hours/7 min = 41 cycles per shift

**\*\*\*\* LOST REVENUE FOR THE MINE \*\*\*\***

**LOOSING 7 cycles x 12.6 tons = 84 tons / shift**

Lost at 1% metal content = 84 kg/shift x 22 shifts per month = 1,848 kg of metal per month

**LOST PRODUCTION: **due to operator training x 3 weeks x 5 days = 6-hour shift x 80% utilization = 72 hours of LOST PRODUCTION TIME or 240 CYCLES LOST and 303 LOST TONNES while operator received full week’s training over 3 separate training weeks.

**DIGITAL SOLUTION SAVES PRODUCTION: **AFTER ANAYZING DIGITAL DATA clearly showed mine management that Operator was only slow to SCOOP the muck. They kept up with their colleagues throughout the rest of the cycle.

**\*\*\* DATA SHOWED THEIR SCOOPING WAS THE PROBLEM \*\*\***

**RESULT – **Mine management FOCUSED 1 day with operator training on HOW TO SCOOP

**OPERATOR PROBLEM SOLVED: **the Operator, from that day on was able to keep up with the rest of their shift’s cycle times!

**\*\*\* 9 MONTH ESTIMATED LOST REVENUE FOR MINE (1 operator) \*\*\* **

**LOST TONNES/ WEEK = 84t/shift x 5shifts/week x 36 weeks (9 months) x 80% Beneficiation Plant efficiency = ESTIMATED LOST REVENUE $ 1,753,920**

*\*estimated ore value CAD $145/t *

### Related posts

- [Major Milestone at Odyssey Mine: Meet & Pass](https://epiroc.blog/canada/major-milestone-at-odyssey-mine-meet-pass?hsLang=en)  December 12, 2025
- [Agnico Eagle’s Odyssey Mine Sets a New Standard in Technology Transformation](https://epiroc.blog/canada/agnico-eagles-odyssey-mine-sets-a-new-standard-in-technology-transformation?hsLang=en)  July 07, 2024
- [Dynamitage TCG Orders Four SmartROC D65s from Epiroc to Deploy in Quebec, Canada](https://epiroc.blog/canada/dynamitage-tcg-orders-four-smartroc-d65s-from-epiroc-to-deploy-in-quebec-canada?hsLang=en)  July 07, 2024
- [Digital Solutions Overview](https://epiroc.blog/canada/digital-solutions-overview?hsLang=en)  June 06, 2024
- [IAMGOLD’s Autonomous Pit Viper Fleet: A First for Epiroc Canada](https://epiroc.blog/canada/iamgolds-autonomous-pit-viper-fleet-a-first-for-epiroc-canada?hsLang=en)  November 11, 2023
- [Simulators](https://epiroc.blog/canada/epiroc-simulators?hsLang=en)  October 10, 2023

- Contact Us 
    - 1-800-465-6719
    - [support.canada@epiroc.com](mailto:support.canada@epiroc.com)
    - [epiroc.com/en-ca](https://www.epiroc.com/en-ca)

© 2023 Epiroc Canada. All rights reserved.  
[Legal Notice and Cookies](https://www.miningandconstructionusa.com/privacy-portal?hsLang=en)

[![epiroc](https://epiroc.blog/hubfs/Epiroc_February2019%20Theme/image/epiroc-logo.svg)](https://epirocmining.devface.com/)

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Dawn Larsen",
    "url" : "https://epiroc.blog/canada/author/dawn-larsen"
  },
  "dateModified" : "2023-08-14T23:31:42.413Z",
  "datePublished" : "2023-08-14T23:28:25.000Z",
  "headline" : "How UG Mine Turned Around a $1.7 Million Loss by Analyzing the Data",
  "image" : [ "https://epiroc.blog/hubfs/1-1.png" ],
  "mainEntityOfPage" : {
    "@id" : "https://epiroc.blog/canada/how-ug-mine-turned-around-a-1.7-million-loss-by-analyzing-the-data",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://epiroc.blog/hubfs/yellow_epiroc.png"
    },
    "name" : "Epiroc USA LLC"
  }
}
```